Fence Post Concrete Calculator: Bags per Hole
Quikrete's guide says to dig each post hole 3 times the width of the post. For a 4x4 post (about 3.5 in) that is a 10.5 in hole; at 30 in deep with 6 in of gravel and the top 3 in left for soil, each hole takes 0.90 cu ft: about 2.4 bags of 50 lb Quikrete Fast-Setting. Ten posts take 25 bags.
Set up for: fence or mailbox posts · Different project?
The maker's post-hole method
- “Dig the post hole , making it three times the width of the post and at a depth equal to 1/3 to 1⁄2 of the above-ground length of the post, plus 6"”
- “Pour 6" of grave l or crushed stone into the bottom of the hole.”
- “Fill the hole with concrete up to 3 to 4" below the ground level.”
Quikrete's other documents word the depth differently: “Start by digging the post hole about 3 times the diameter of the post. Hole depth should be 1/3 the overall post height.” (Fast-Setting data sheet) and “the depth of the post hole should be one-half of the above-ground post height.” (online calculator). The calculator uses the depth you type and shows the guide's range when you enter the post's height above ground.
By post size: 4x4 posts · 6x6 posts
FAQ
How many bags of concrete per fence post?
It depends on the hole, not the post alone. With Quikrete's rule (hole 3× the post width) a 4x4 at 30 in deep with a 6 in gravel base takes about 2.4 bags of 50 lb fast-setting mix. The calculator works it out for your post and depth.
How deep should a fence post hole be?
Quikrete's guide words it as: “Dig the post hole , making it three times the width of the post and at a depth equal to 1/3 to 1⁄2 of the above-ground length of the post, plus 6"”. Its data sheet and online calculator word it differently (“Start by digging the post hole about 3 times the diameter of the post. Hole depth should be 1/3 the overall post height.”; “the depth of the post hole should be one-half of the above-ground post height.”). Local rules and frost depth can require more; check your building department. We use the depth you enter.
Can you pour fast-setting concrete dry into the hole?
Quikrete's Fast-Setting data sheet describes pouring the dry mix into the hole and then adding water, “approximately 1 gal (3.8 L) of water for each 50 lb (22.6 kg) bag”, depending on soil conditions. Regular concrete mix is mixed with water first.
Sources
- Quikrete: QUIKRETE guide: Setting Posts in Concrete · fetched and reviewed 2026-11-10
- Quikrete: QUIKRETE Fast-Setting Concrete Mix (No. 1004-50) data sheet · fetched and reviewed 2026-11-10
- Quikrete: QUIKRETE project calculator page · fetched and reviewed 2026-11-10
- Quikrete: QUIKRETE online project calculator (calculator.js) · fetched and reviewed 2026-11-10
- Quikrete: QUIKRETE Concrete Mix (No. 1101) data sheet · fetched and reviewed 2026-11-10
- Sakrete: Sakrete High Strength Concrete Mix technical data sheet · fetched and reviewed 2026-11-10